top of page

NEXT Stormwater

A Comprehensive Stormwater Management Solutions

For over 20 years, the NEXT products have been at the forefront of designing innovative and sustainable stormwater management systems. Our solutions empower urban and industrial infrastructures to effectively manage water while meeting the highest environmental and industry standards.

box with water_edited.jpg

Want to explore how NEXT can optimize your projects?

box bg.png

EZSTORM™

RETENTION, DETENTION, INFILTRATION

A modular stormwater chamber designed for efficient water retention, detention, and infiltration. Lightweight, durable, and easy to install, EZStorm+ maximizes underground storage while minimizing maintenance.

Création sans titre (39).png

SDD3™

HYDRODYNAMIC OIL GRIT SEPARATOR

SDD3 efficiently captures oils, sediments, and debris from stormwater runoff, preventing pollutants from entering waterways. Its compact design ensures easy installation and maintenance.

conflow cut 1.png

CONFLOW

FLOW REGULATOR

ConFlow regulates stormwater flow to prevent system overload, ensuring controlled discharge rates and optimal performance. Designed for reliability and easy integration.

A91w1b0eq_11kivp1_mo4 1_edited.png

EPSILON PIVOT

CHECK VALVES

Epsilon removes sediments, oils, and debris from stormwater using hydrodynamic separation. A compact and efficient solution for improving water quality.

FlowFilter - Hydrosystem - 1_edited.png

FlowFilter

ADVANCED STORMWATER FILTERING SOLUTIONS

The FlowFilter is an advanced stormwater system that removes pollutants and improves water quality with reliable, sustainable performance.

EZStorm Calculator mockup.png

EZstorm Online Design Tool

Design and size EZstorm retention basins online using modular crate systems.

image 8 (1) 1_edited.png

PROJECTS

St-Hubert Airport Parking

One of the largest stormwater retention

systems in Quebec in 2024.

404665676_1115096293195349_2405453134192960844_n 1 (1) 1 (1)_edited.jpg
Square Bellevue Parking

First winter installation of the EZstorm system.

IMG_3300 1 (1) 1 (1)_edited.jpg
Panama Bus Station

An 1,800-cubic-meter project, completed in 3 days.

bottom of page